旧房翻新计算器

不能只看转售价格。

测算贷款、自有资金及盈亏平衡售价,再观察延期或成本变化如何影响利润。

项目规划

逐项核算项目收益及资金。

您的项目 (Your project)

查看结果↓ (View results ↓)

修改示例金额,测算自己的交易。 (Change the example amounts to explore your deal.)

01 物业及时间 (Property & timeline)
从购置到出售,包括翻新时间。 (From purchase to sale, including renovation.)
从购置到翻新完工,不得超过总持有期。若购置时即拨出全部翻新款,填0。 (From purchase until rehab is complete. Cannot exceed the total hold. Use 0 if all rehab funds are drawn at purchase.)
02 贷款结构 (Loan structure)
采用哪种方式估算利息? (How should we estimate loan interest?)
按预期完工价值限制模型中的贷款总额,实际比例上限须经审核。 (Caps the total modeled loan using the expected completed value. Actual limits depend on underwriting.)
在ARV上限调整后的模型承诺额度上计算。 (Applied to the modeled loan commitment after the ARV limit.)
03 购置、持有及出售费用 (Acquisition, holding & sale costs)
不包括上方已输入的点数费用。 (Exclude points already entered above.)
税、保险、公用设施等费用,不包括贷款利息。 (Taxes, insurance, utilities and other costs. Exclude loan interest.)
佣金及其他按售价比例计算的出售费用。 (Commission and other percentage-based sale costs.)
04 可选费用 (Optional costs)
若翻新预算已包含缓冲,填0。额外金额视为实际支出,由自有资金承担。 (Leave at 0 if your rehab budget already includes a buffer. Any extra amount is treated as spent and paid from your own funds.)
05资金时点及储备 (Cash timing & reserves)

先估算前期及分期拨款期间所需资金,再计入模型出售前的计划利息和持有费用。 (Estimate upfront and draw-period funding, then include scheduled interest and holding costs through the modeled sale.)

预计报销前需垫付的已完成合格工程款最大金额,不得超过模型中的翻新贷款额度。 (Largest amount of completed eligible work you expect to pay before reimbursement. Cannot exceed the modeled renovation commitment.)
由您选择保留的可用现金,未使用时不属于项目费用。 (Cash you choose to keep available. This is not a project expense unless spent.)

理解计算结果

为意外变化留出余量。

估算利润为售价减去全部模型成本。购置及翻新成本已计入,不再重复扣贷款本金。利润未扣所得税;所列利润率为利润除以售价,不是现金投入回报率。现金回报以出售前全部模型现金投入为基数,而不只看首付。实际分期拨款、报销时间、费用及延期均会影响所需资金。